No.60 has seen much work over the last month.

A full inspection of the chassis and components. The wheelsets for the front power unit have been profiled, repainted and reinstalled. New brake blocks have been fitted during the reassembly process. The new piping for the air braking system has been fitted on the front power unit along with a new coupling head to match our stock and safety chains. The front unit is awaiting new piston rings and work on the motion, ready for service.

The front power unit has now been reconnected to the boiler cradle and work has begun on the rear power unit.

en English
X