Select Page

The spring hangers have been removed, built up, machined back to shape and re-riveted to the frames.  All the loose rivets on the frame have been removed and replaced.  The beading on the tanks has been removed and straightened. The tank edge has been cleaned and the beading is being re-fitted with original rivet detail.  The Cab is being straightened and the worn out rain strips are being replaced. The axle boxes have been machined and new horn inserts machined and fitted. New pressure strips have been fitted and a mould for casting the white constructed.  The frames have been measured and drawings prepared for machining the new horn faces.

en English
X