The detail work on Carriage 11 has been continuing with bespoke panelling having been designed for the insides of the doors that matches the sides of the carriages. Work on the fittings such as table supports and the table tops has also been taking place, though much detail work is still to come before this work of art will be complete and ready for traffic.

en English
X