Since the last update the Baldwin has had its cab riveted together, the holes required for the various pipework have been cut in the cab front and new handrails have been fabricated.  A custom spark arrestor designed in house by our team has been made and installed, a new bracket for the water lifting pipe on the rear of the bunker has been fabricated and temporarily clamped in place.

en English
X