The transformation of Carriage No.11 has been continuing with the test fitting of the new brass doorsills that have been cast in our forge at our Surrey workshops.  A mock-up has been made for the folding table design for the first class compartment.  Work is also continuing to develop the mouldings for the First class compartment with the beginning of a design mock up being fitted to the door interior and the moulding being lined up with those on the carriage interior.

en English
X