Copyright ©2008 Bruce Yarborough

The Vale of Rheidol Railway

2008 TIMETABLE
Trains run on the coloured days only
.

March
M T W T F S S
             
             
             
        21 22 23
24 25 26 27   29  
             
April
M T W T F S S
  1 2 3   5  
  8 9 10   12  
  15 16 17   19  
  22 23 24   26  
  29 30        
             
May
M T W T F S S
      1   3 4
5 6 7 8   10  
12 13 14 15   17  
19 20 21 22   24 25
26 27 28 29 30 31  
             
June
M T W T F S S
             
2 3 4 5 6 7  
9 10 11 12 13 14  
16 17 18 19 20 21  
23 24 25 26 27 28  
30            
July
M T W T F S S
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      
             
August
M T W T F S S
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
             
September
M T W T F S S
1 2 3 4   6  
8 9 10 11   13  
15 16 17 18   20  
22 23 24 25   27  
29 30          
             
October
M T W T F S S
    1 2   4  
  7 8 9   11  
  14 15 16   18  
  21 22 23   25  
  28 29 30      
             

 


Aberystwyth Depart 10.30am 2.00pm
or
10.30am 12.15pm 2.00pm 3.45pm
Devil's Bridge Arrive 11.30am 3.00pm 11.30am 1.15pm 3.00pm 4.45pm

Devil's Bridge Depart 12.30pm 4.00pm
or
12.30pm 2.15pm 4.00pm 5.45pm
Aberystwyth Arrive 1.30pm 5.00pm 1.30pm 3.15pm 5.00pm 6.45pm
According to the colour shown on the calendar above. The railway is closed on "white" days.

Please Note:
Full return trips are not available on the 16.00 and 17.45 departures from Devils Bridge.
All trains wait at Devils Bridge 1 hour before returning to Aberystwyth.

Disabled Access:
The original carriages used on the railway were not designed to carry wheelchairs and therefore access at present is only possible if wheelchair users can climb two steps from the platform into the carriage. An access statement is available on request.

Back to the top